{"id":3595,"date":"2024-09-18T05:22:45","date_gmt":"2024-09-18T05:22:45","guid":{"rendered":"https:\/\/fantaseaplus.com\/?p=3595"},"modified":"2024-09-18T05:32:01","modified_gmt":"2024-09-18T05:32:01","slug":"%f0%9f%8f%97%ef%b8%8f-august-construction-update-fantasea-condo-kamala-%f0%9f%8f%a2-2","status":"publish","type":"post","link":"https:\/\/fantaseaplus.com\/ru\/2024\/09\/18\/%f0%9f%8f%97%ef%b8%8f-august-construction-update-fantasea-condo-kamala-%f0%9f%8f%a2-2\/","title":{"rendered":"\ud83c\udfd7\ufe0f August Construction Update – Fantasea Condo Kamala \ud83c\udfe2"},"content":{"rendered":"\n
We\u2019re thrilled to share the progress we\u2019ve made in August at Fantasea Condo Kamala! \ud83c\udf89 Here\u2019s an overview of the advancements made over the past month:<\/p>\n\n\n\n \u2022 \u26a1 Electrical Installation: The power systems have been installed, and the electrical conduits are all in place, ensuring the building\u2019s utilities are on track for completion. We are moving steadily toward completion and are excited to see the vision for Fantasea Condo Kamala coming to life! Stay tuned for more updates in the coming months! \u2728<\/p>\n","protected":false},"excerpt":{"rendered":" We\u2019re thrilled to share the progress we\u2019ve made in August at Fantasea Condo Kamala! \ud83c\udf89 Here\u2019s an overview of the advancements made over the past month: \u2022 \u26a1 Electrical Installation: The power systems have been installed, and the electrical conduits are all in place, ensuring the building\u2019s utilities are on […]<\/p>\n","protected":false},"author":1,"featured_media":3582,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[141,147],"acf":[],"_links":{"self":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3595"}],"collection":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/comments?post=3595"}],"version-history":[{"count":1,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3595\/revisions"}],"predecessor-version":[{"id":3605,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3595\/revisions\/3605"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/media\/3582"}],"wp:attachment":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/media?parent=3595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/categories?post=3595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/tags?post=3595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<\/figure>\n<\/figure>\n\n\n\n
\u2022 \ud83d\udeb0 Plumbing & Fire Systems: The water supply and fire safety systems have been successfully set up, including the installation of pumps and piping throughout the building. \ud83d\udca7\ud83d\ude92
\u2022 \ud83c\udfa8 Interior Finishing: We\u2019ve started the interior finishing, including wall painting, ceiling installations, and flooring, making the units feel closer to completion.
\u2022 \ud83c\udfde\ufe0f Rooftop Structure: Significant progress has been made on the rooftop area, where the structure for common spaces, including the swimming pool and lounge areas, is being developed. \ud83c\udf3f\ud83c\udfca
\u2022 \ud83d\udeaa Final Touches: Windows, doors, and bathroom installations are in progress, giving the units their first glimpse of livable space. \ud83d\udeaa\ud83d\udebf<\/p>\n\n\n\n<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n<\/figure>\n\n\n\n