{"id":3116,"date":"2023-10-26T04:23:27","date_gmt":"2023-10-26T04:23:27","guid":{"rendered":"https:\/\/fantaseaplus.com\/?p=3116"},"modified":"2024-05-07T08:15:18","modified_gmt":"2024-05-07T08:15:18","slug":"monthly-construction-update-fantasea-condo-kamala-october-2023-2","status":"publish","type":"post","link":"https:\/\/fantaseaplus.com\/cn\/2023\/10\/26\/monthly-construction-update-fantasea-condo-kamala-october-2023-2\/","title":{"rendered":"\u6bcf\u6708\u65bd\u5de5\u66f4\u65b0\uff1a\u5361\u9a6c\u62c9\u5e7b\u591a\u5947\u516c\u5bd3\uff082023 \u5e74 10 \u6708\uff09"},"content":{"rendered":"

[vc_row][vc_column][vc_column_text]<\/p>\n

Her is the latest construction update for the Fantasea Kamala Condo project! As we move further into the development, we are excited to share the progress we\u2019ve made in the month of October. Our commitment to quality and safety remains paramount as we work diligently to bring this vision to life. Here\u2019s a rundown of the significant milestones achieved in this month:<\/p>\n

<\/span>Building B\u2019s Grease Trap Installation<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2820″ img_size=”full” alignment=”center”][vc_column_text]<\/p>\n

In our efforts to ensure the functionality and sustainability of Fantasea Kamala Condo, we\u2019ve reached an important milestone by installing a grease trap for Building B. This essential component will help us manage kitchen waste and maintain a clean and environmentally responsible operation.<\/p>\n

<\/span>Reinforcement Steel Bar for Building B\u2019s Septic Tank Footing<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2821″ img_size=”full” alignment=”center”][vc_column_text]<\/p>\n

Strengthening the foundation of Building B, we\u2019ve reinforced the steel bars for the septic tank\u2019s footing. This reinforcement work is crucial for maintaining the structural integrity and durability of the building.<\/p>\n

<\/span>Pouring Concrete for Building B\u2019s Septic Tank Footing<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2822″ img_size=”full” alignment=”center”][vc_column_text]<\/p>\n

To support the septic system of Building B, we\u2019ve successfully poured concrete for the footing. This is a significant step towards ensuring proper waste management within the condominium complex.<\/p>\n

<\/span>Formwork Installation for Building A\u2019s Shear Wall<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2823″ img_size=”full”][vc_column_text]<\/p>\n

Building A is making significant progress with the installation of formwork for the shear wall. This process ensures the structural stability and safety of the building, and we are committed to adhering to the highest construction standards.<\/p>\n

<\/span>Excavation Work for Building A\u2019s Footing<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2824″ img_size=”full”][vc_column_text]<\/p>\n

Excavation work for Building A\u2019s footing has been ongoing, and it\u2019s an essential phase in preparing the foundation for the building. Proper excavation is key to ensuring the building\u2019s stability and longevity.<\/p>\n

<\/span>Footing for Building B\u2019s Septic Tank<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2825″ img_size=”full” alignment=”center”][vc_column_text]<\/p>\n

In addition to the reinforcement of the septic tank\u2019s footing for Building B, we\u2019ve made substantial progress in the installation of the actual footing itself. This paves the way for the septic tank\u2019s construction.<\/p>\n

<\/span>Re-bar & Formwork for Building B\u2019s Septic Tank<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2826″ img_size=”full”][vc_column_text]<\/p>\n

The combination of re-bar and formwork for Building B\u2019s septic tank is an essential part of our dedication to providing residents with reliable and efficient waste management.<\/p>\n

<\/span>Formwork for Shear Wall in Building A<\/b><\/h2>\n

[\/vc_column_text][vc_single_image image=”2827″ img_size=”full”][vc_column_text]The installation of formwork for the shear wall in Building A is a crucial step in ensuring the building\u2019s structural integrity. We are committed to maintaining the highest standards of construction.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"

[vc_row][vc_column][vc_column_text] Her is the latest construction update for the Fantasea Kamala Condo project! As we move further into the development, we are excited to share the progress we\u2019ve made in the month of October. Our commitment to quality and safety remains paramount as we work diligently to bring this vision […]<\/p>\n","protected":false},"author":1,"featured_media":2819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3116"}],"collection":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/comments?post=3116"}],"version-history":[{"count":2,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3116\/revisions"}],"predecessor-version":[{"id":3167,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/posts\/3116\/revisions\/3167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/media\/2819"}],"wp:attachment":[{"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/media?parent=3116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/categories?post=3116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fantaseaplus.com\/wp-json\/wp\/v2\/tags?post=3116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}