Image

Fantasea Plus is a real estate development company with a vision to create unique and luxurious properties in premier locations.

178/25 Moo 5 Choeng Thale Subdistrict Thalang Phuket 83110 Thailand
+66 85 350 3455

info@fantaseaplus.com

© 2024 Fantasea Plus Co.,Ltd.

每月施工更新:卡马拉幻多奇公寓(2023 年 10 月)

每月施工更新:卡马拉幻多奇公寓(2023 年 10 月)

Her is the latest construction update for the Fantasea Kamala Condo project! As we move further into the development, we are excited to share the progress we’ve made in the month of October. Our commitment to quality and safety remains paramount as we work diligently to bring this vision to life. Here’s a rundown of the significant milestones achieved in this month:

Building B’s Grease Trap Installation

In our efforts to ensure the functionality and sustainability of Fantasea Kamala Condo, we’ve reached an important milestone by installing a grease trap for Building B. This essential component will help us manage kitchen waste and maintain a clean and environmentally responsible operation.

Reinforcement Steel Bar for Building B’s Septic Tank Footing

Strengthening the foundation of Building B, we’ve reinforced the steel bars for the septic tank’s footing. This reinforcement work is crucial for maintaining the structural integrity and durability of the building.

Pouring Concrete for Building B’s Septic Tank Footing

To support the septic system of Building B, we’ve successfully poured concrete for the footing. This is a significant step towards ensuring proper waste management within the condominium complex.

Formwork Installation for Building A’s Shear Wall

Building A is making significant progress with the installation of formwork for the shear wall. This process ensures the structural stability and safety of the building, and we are committed to adhering to the highest construction standards.

Excavation Work for Building A’s Footing

Excavation work for Building A’s footing has been ongoing, and it’s an essential phase in preparing the foundation for the building. Proper excavation is key to ensuring the building’s stability and longevity.

Footing for Building B’s Septic Tank

In addition to the reinforcement of the septic tank’s footing for Building B, we’ve made substantial progress in the installation of the actual footing itself. This paves the way for the septic tank’s construction.

Re-bar & Formwork for Building B’s Septic Tank

The combination of re-bar and formwork for Building B’s septic tank is an essential part of our dedication to providing residents with reliable and efficient waste management.

Formwork for Shear Wall in Building A

The installation of formwork for the shear wall in Building A is a crucial step in ensuring the building’s structural integrity. We are committed to maintaining the highest standards of construction.

Leave a Reply

Your email address will not be published.